Description
Seeks qualified architectural and engineering consulting services to evaluate, cost out, plan, and prepare construction documents for phased renovation of the old Lincoln County courthouse. Vendors should be professional firms specializing in architectural and engineering consultancy.
Responses Due: 3pm Tuesday, December 15, 2026
Overview
With the opening of the new Lincoln County Justice Center in the fall of 2026, Lincoln County, SD seeks qualified architectural and engineering consulting services to evaluate, cost out, plan, and prepare construction documents for phased renovation project to the old Lincoln County courthouse. The old courthouse was originally constructed in 1889 and it requires significant repairs and interior improvements in order to maximize the current space for future County use.
Estimated Schedule
September 9, 2026 RFP Approved by Commission
September 10, 2026 RFP Released
November 10, 2026, 9am-noon Required site visit
November 17, 2026 Deadline for submission of questions
December 1, 2026 Responses to questions made available publicly
December 15, 2026, at 3 pm Deadline for submission of proposal via email
January 5, 2027 Review of proposals
January 12, 2027 Completed interviews of consultants
January 26, 2027 at 6:30 p.m. Selection of consultant
February 2, 2027 Contract execution
Scheduled times and deadlines may be adjusted on an as needed basis. Any schedule adjustments will be posted on https://lincolncountysd.gov/bids.aspx.
Context and Background
The Lincoln County Courthouse has historic significance and is in need of comprehensive renovations to meet future County needs. Lincoln County is the fastest growing County in South Dakota and one of the fastest growing counties in the nation. As the population grows, so does the personnel needed to service the citizens as Lincoln County. As previously mentioned, the Courthouse was constructed in 1889, with. The building is approximately 72,000 sf. The administration wing connected to the courthouse was completed in 2008. To meet future spacing needs, the Lincoln County Board of Commissioners wishes to explore the possibility of structural and layout renovations to the old courthouse. The courthouse has served as a valued community asset Lincoln County and it also contributes to the character of County seat’s downtown area.
The building requires evaluation for structural integrity, building systems upgrades, accessibility improvements, and interior renovations to ensure it continues to serve the County effectively for decades to come.
The selected consultant(s) will be expected to conduct total assessments of the courthouse and the administration buildings, identify necessary repairs and improvements, develop cost estimates, and prepare detailed construction plans and specifications. The County anticipates that work will need to address cost effective recommendations to both exterior preservation needs and interior repairs and functional improvements, all while respecting the historic character of the courthouse.
In October of 2019, the County had an assessment of the courthouse done and in April of 2026, the County also had a specific assessment of the roof trusses done. The reports and findings of these assessments are on file at the Lincoln County Auditor’s Office. The County wishes to have a total and in-depth evaluation of the structure conducted in order to verify the past findings and uncover any other damage that needs to be repaired. It is expected that this may involve slightly invasive methods.
All work must comply with state and local regulations, and relevant accessibility requirements including the Americans with Disabilities Act (ADA). The consultant may work with the South Dakota Historical Society and other relevant agencies as needed as well as work closely with County officials.
Scope of Work and Deliverables
The County seeks comprehensive architectural and engineering services for the courthouse as well as the connected administration building to include, but not be limited to:
Phase 1: Assessment and Planning
· Conduct comprehensive condition assessments of all two buildings using previous work as a guide and starting point: including structural, mechanical, electrical, plumbing, security and access, HVAC, exterior masonry and finishes, etc.;
· Evaluate historic significance and preservation;
· Assess current building code compliance and identify required upgrades;
· Evaluate ADA accessibility and develop compliance strategies, if deemed necessary;
· Conduct hazardous materials surveys (lead paint, asbestos, etc.);
· Assess energy efficiency and identify improvement opportunities;
· Develop prioritized and complete list of recommendations for repairs and improvements;
· Assist the County with the development and execution of a funding strategy (fundraising, grants, etc.);
· Evaluate space needs for County departments;
· Conduct meetings with Department Directors and the Board of Commissioners to review the courtroom in the administration building now that it will be County designated space for layout revisions;
· Evaluate and make recommendations regarding interior finis